Discovery CE was instructed by Elan Homes to produce a Remediation Strategy at their site in Two Gates, Tamworth. The purpose of the Remediation Strategy was to mitigate the risks posed by contamination identified at the site. The proposed development comprises thirty-seven low-rise residential units with associated infrastructure and garden areas.
The Remediation Strategy for the site includes the adoption of a clean cover system for the localised area of metal / metalloid and hydrocarbon contamination. The system will involve the laying of a minimum of 600mm of clean imported soils comprising sub-soil and top-soil materials laid on a geotextile separator membrane.